Lumeis

Works, measurement and cash reading the same contract

Planning, the daily site log, the ERP and equipment management each hold a piece of the same contract. Lumeis OS brings them into one base and shows where work moves ahead without being measured.

Monday briefingWeek 46
  • WorksWork fronts with physical progress behind schedule12
  • MeasurementWork done that has not entered the measurement reportR$ 8.4M
  • EquipmentEquipment idle for more than 5 days and still on rental37
  • ProcurementCritical material orders with late delivery19
  • ContractsRebalancing claims with no reply from the client for 60 days6
ERP · planning · daily site log · telematics · contract managementIllustrative example

The works moved ahead. Measurement fell behind.

When the board only looks at the schedule, the contract seems on track. Work left out of the report only shows up months later, as a cash shortfall.

Highway duplication · lot 2 · 2026

Illustrative example
  • Executed on site (daily site log)
  • Measured and approved by the client
  • Work done and not measured
020406080M1M2M3M4M5M6M7M8

R$ millions, cumulative, at the end of each month

Time from execution to payment

38 81 days

Lumeis OS matches the daily site log with the measurement report. When executed work is left out, the alert arrives before the monthly cutoff.

Each stage of the contract holds one part of the margin

Estimating sees the bid. Planning sees the schedule. The site sees the log. Finance sees the invoice. Margin shows up where the four views meet.

  1. Estimating and bid

    Cost breakdowns, overhead rate and bid assumptions.

    Where visibility stopsNobody tracks the bid assumptions once the contract is signed.

  2. Planning

    Schedule, S-curve and contract milestones.

    Where visibility stopsThe schedule is revised in a spreadsheet, far from the site.

  3. Site execution

    Daily site log, output per front, crews and weather.

    Where visibility stopsProgress stays in the log and is slow to reach measurement.

  4. Equipment and procurement

    Machine hours, fuel, rentals and material orders.

    Where visibility stopsAn idle machine keeps billing rent and nobody notices.

  5. Measurement and billing

    Measurement reports, price adjustments, change orders and payment.

    Where visibility stopsDeductions arrive without the history of the work done.

Lumeis OSOne view of the contract from bid to closeout, with the source of every number.

The construction year follows the rain and the measurement

Infrastructure runs on weather and contracts: rain, dry season, measurement and price adjustments. What goes unmeasured in the dry season is missing from cash in the rainy one.

  1. jan

    Rainy season

    Separates delays caused by rain from production delays, front by front.

  2. mar

    Prior-year results

    Closes cost, revenue and margin for each contract with one definition.

  3. apr

    Fronts restart

    Shows which fronts return to the scheduled pace after the rains.

  4. jun

    Peak of the dry season

    Tracks daily earthworks and paving output against the plan.

  5. jul

    Budget review

    Compares planned and actual cost for the half year, project by project.

  6. oct

    Rains return

    Lists the work that needs to be measured before output drops.

  7. dec

    Year-end close

    Shows executed, unmeasured work carried into the new year, by contract.

Every month · measurement reportEvery measurement read together with the daily site log and cost, by contract and by front.

Each team's question, with the source alongside

Questions Lumeis OS answers

  1. 01Which fronts are behind the progress planned in the schedule?
  2. 02How much of this month's delay came from rain?
  3. 03Which contract milestones are at risk of a penalty?
AnswerIllustrative example

12 fronts closed the week with physical progress below the schedule.

Why
Eight of them depend on two excavators that have been in the workshop since week 44.
Next step
Take the list to the contract manager, with each front's progress week by week.
Sources
  • Planning · schedule
  • Daily site log · output
  • Equipment management · maintenance

One definition for every number in the contract

The site counts progress one way, finance another. In Lumeis OS each metric has one definition in the context, and every team uses the same one.

  • Physical progress

    Definition

    Work executed, weighted by each item in the budget, over the contract total.

    SourceDaily site log and planning
  • Executed, not measured

    Definition

    Value of executed work that has not entered an approved measurement report.

    SourceDaily site log and measurement
  • Schedule performance index

    Definition

    Earned value of the work done over the planned value for the same date.

    SourcePlanning · S-curve
  • Cost performance index

    Definition

    Earned value of the work done over the actual cost incurred to do it.

    SourceERP · cost and planning
  • Equipment availability

    Definition

    Hours the machine was fit to operate, over the scheduled hours.

    SourceTelematics and maintenance management
  • Deduction rate

    Definition

    Value deducted by the client, over the value submitted in the measurement.

    SourceMeasurement · reports

Talk about a infrastructure process

Tell us which process hurts the most today.