38 feeders closed the month with losses above the regulatory target.
- Why
- In 24 of them, estimated readings passed 15% of units after the meter reading contractor changed.
- Next step
- Send the list to the inspection team, with the units showing the largest drop in consumption.
- Metering · readings
- Billing system · invoicing
- GIS · feeders
- Inspection · work orders